Industry Graph
Mostrando 1-5 de 5 artigos, teses e dissertações.
-
1. Direct sequencing of blocks in stochastic models with multi-mines and multi-destinations
Abstract Mining Scheduling is the one that maximizes profit from mining over time. By means of computational methods, the deposit is discretized in blocks and algorithms are used to consummate this objective. The methods that are widely known nowadays for mining scheduling optimization of a discrete block model were based on graph theory, and among those mos
REM, Int. Eng. J.. Publicado em: 16/09/2019
-
2. GRAPH PROPERTIES OF MINIMIZATION OF OPEN STACKS PROBLEMS AND A NEW INTEGER PROGRAMMING MODEL
The Minimization of Open Stacks Problem (MOSP) is a Pattern Sequencing Problem that often arises in industry. Besides the MOSP, there are also other related Pattern Sequencing Problems of similar relevance. In this paper, we show that each feasible solution to the MOSP results from an ordering of the vertices of a graph that defines the instance to solve, an
Pesqui. Oper.. Publicado em: 2015-08
-
3. Projeto gráfico em jornal-laboratório:ensaio de novas linguagens ou mimetismo mercadológico / Project Graph in Journal-laboratory: testing of new languages or mimicry referring to merchandising.
Esta pesquisa apresenta os projetos gráficos de três Jornais-laboratório - Entrevista, Matéria Prima e Primeira Impressão - de três universidades da Cidade de Santos, Litoral de São Paulo. Procura identificar avanços, estagnação ou retrocessos na linguagem gráfica desses produtos acadêmicos, e se os projetos gráficos dos periódicos constituem e
Publicado em: 2007
-
4. Desenvolvimento de um modelo de capacitação do ERP por meio de programação matematica : uma aplicação na industria de autopeças / The development of a capacity model for ERP through mathematical programming: application to an auto parts industry
This work presents a scheduling problem case study of a in an auto parts industry. It proposes the integration of a capacity module to an ERP off the shelf. The objective of this integration is to improve the MRP module of the ERP in such way that it recognizes capacity limits of critical resources. Critical resources at shop fioor are modeled as a network f
Publicado em: 2005
-
5. REFINERY SCHEDULING OPTIMIZATION USING GENETIC ALGORITHMS AND COOPERATIVE COEVOLUTION / OTIMIZAÇÃO DA PROGRAMAÇÃO DA PRODUÇÃO EM REFINARIAS DE PETRÓLEO UTILIZANDO ALGORITMOS GENÉTICOS E CO-EVOLUÇÃO COOPERATIVA
This work investigates the use of Genetic Algorithms and Cooperative Coevolution in refinery scheduling optimization. Oil refineries are one of the most important examples of multiproduct continuous plants, that is, a continuous processing system that generates a number of products simultaneously. A refinery processes various crude oil types and produces a w
Publicado em: 2004