Pile Driving
Mostrando 1-3 de 3 artigos, teses e dissertações.
-
1. Retroanálise probabilista aplicada à análise dinâmica da cravação de estacas. / Probabilistic back-analysis applied to dynamic loading test for pile driving.
An dynamic loading test can be performed in concrete piles, bored piles, drilled shafts, auger cast-in-place (continuous flight auger) piles. Such essay bases on the Theory of the Propagation of Wave in piles with the aim of evaluate the capacity of static load mobilized from the dynamic event. The analysis of the test is made by a PC program (p.e. CAPWAP or
Publicado em: 2008
-
2. Comparação entre desempenhos de estacas metálicas tubadas de ponta aberta e fechada na Baixada Santista. / Comparison between the behavior of steel pipe piles with opened and closed ends at the Santos Coastal Plain.
This MSc thesis dealt with the plug phenomenon in open-ended-toes steel pipe piles. This phenomenon occurs when, in the driving process of an open-ended toe pile, the soil that gets into its base alters its behavior, making it similar to one of a close-ended toe under static load and, sometimes, even under dynamic load. Many bored piles, installed with the p
Publicado em: 2005
-
3. A CRAVAÇÃO DE ESTACAS E SUA INFLUÊNCIA SOBRE O SOLO / EL CLAVADO DE ESTACAS Y SU INFLUENCIA SOBRE EL SUELO / PILE DRIVING AND ITS INFLUENCE ON SOIL
Este estudo objetiva reunir, em uma abordagem qualitativa, o que se conhece sobre as modificações, com o tempo, na capacidade de carga de estacas, fenômenos que, neste tr abalho,chamaremos recuperação e relaxação. A importância destas alterações é significativa: após a execução, as estacas podem manter a capacidade de carga inicial, -recuperar-
Publicado em: 1997