Scheduling With Overtime
Mostrando 1-2 de 2 artigos, teses e dissertações.
-
1. Dimensionamento e seqüenciamento de lotes de produção na indústria de suplementos para nutrição animal
This work studies the integrated lot sizing and scheduling problem in the animal feed compound industry. The lot sizing problem in this industry consists of deciding which and how much to produce in each period, in order to minimize overtime and storage costs. The sequencing problem consists of sequencing the production lots, in order to minimize the setups
Publicado em: 2008
-
2. Distribuição de carga e variação de capacidade na programação da produção: resultados na inserção de espera e na utilização de capacidade adicional. / Workload and capacity variation in production scheduling: results in idle time and additional capacity management.
This thesis analyses two cases of one-machine problem regarding to production scheduling with fixed sequence. In both problems, modeling with mathematical programming, and (pseudo)polynomial-time algorithms are suggested. The first problem deals with idle time insertion in the problem where the objective function (represented by a sum of costs) considers tha
Publicado em: 2000